You need an account to access this content
Create a free account and get access to all downloads and more!
Part 3: InteliNeo 530 Rental Applications
Our HMG webinar series closes with rental fleets, where a BESS has to deploy quickly and perform reliably.
Rental fleets need BESS solutions that deploy quickly and perform reliably on every site. Many of these sites also have a backup gen-set for load pick-up or redundancy. The InteliNeo 530 makes it simpler to work with any gen-set, so it fits every temporary and mobile hybrid microgrid.
This webinar is part 3 of 3.
Part 1: Use of Schedule Timers for Time of Use Operation (26 November 2026)
Part 2: Load Control PTM Modes, Import/Export Set-up and Mains Protections (3 December 2026)
Part 3: InteliNeo 530 Rental Applications (10 December 2026)
Discussion of the InteliNeo 530 BESS in rental applications: typical use cases, system architecture and the requirements of temporary or mobile hybrid microgrids.
Discussion and demonstration of a standard set-up and commissioning procedure for an InteliNeo 530-controlled BESS in a rental fleet, including operation alongside rental gen-sets.
The session will conclude with a Q&A.