BESS Parallel to Mains: Protections and Import/Export Setup

Part 2: BESS Parallel to Mains: Protections and Import/Export Setup

Part 2 of our HMG webinar series moves on to the grid connection. Many sites run batteries, solar and generators alongside the utility grid. This session explains in plain terms how that works and how the control modes in InteliNeo 5500 & 6000 and InteliMains 1010 can let you decide how much power comes from the grid and how much from your own system. We will also cover grid import/export limits and Mains Protections with breaker control, which keep the grid connection safe and compliant. 

This webinar is part 2 of 3.  

Part 1: Use of Schedule Timers for Time of Use Operation (26 November 2026) 

Part 2: Load Control PTM Modes, Import/Export Set-up and Mains Protections (3 December 2026) 

Part 3: InteliNeo 530 Rental Applications (10 December 2026)

Agenda

Discussion of Mains Preference and the Load Control PTM modes: how each mode behaves and when to use it. 

Discussion and demonstration of setting up import/export limits and the Mains Protections option with BCB, PVCB and MCB breaker configurations. 

The session will conclude with a Q&A. 

Our website uses cookies and similar technologies to provide you the best experience and to understand how you use our site.

You may either „Accept all“ by which you agree with using functional, analytical and marketing cookies. By pressing „Revoke“ only necessary cookies shall be allowed to enable the website and applications function correctly. To revoke your consent you can do it from footer menu in Change cookie preferences section.

You can find more information on the Cookie page and the Privacy section .